Building a Round House
Part 4 - Interior Work - Upstairs (Main Floor)
Summer - Fall 2006
Now things slow down as we work on the interior. (View the floor
plans.)
Framing
![](House/Wall-LR.jpg)
Wall between living room and bedroom.
![](House/LoftWall-BR2.jpg)
Loft above center area of house.
![](House/LoftStairs1.jpg)
Stairs to the loft.
![](House/FoyerSm.jpg)
Foyer-to-be
This composite of three photos shows the entire "great room"
back wall and loft.
Foyer and Hall
![](House/Blackboard.jpg)
An old slate blackboard trimmed out to match the windows and doors is
a prominent feature of the foyer.
![](House/FoyerLight2Sm.jpg)
Tiffany-style pendant light in the foyer.
![](House/Floor-HallSm.jpg)
Hardwood flooring in "Fort Pitt Tunnel" hall.
Great Room (Living-Dining Areas)
![](House/GreatRoom2Sm.jpg)
Living room end of "great room".
Hardwood floor installed--hole is for the compass rose medallion.
![](House/GR-LivingRoom09Sm.jpg)
Cleaned up and just about ready to use.
![](House/GreatRoom4Sm.jpg)
Dining room side of "great room".
Hardwood floor installed--hole is for the compass rose medallion.
![](House/CompassRose8Sm.jpg)
Christy and John admire the parquet
compass rose medallion.
![](House/DiningArea2Sm.jpg)
Dining area with paint and most of the window trim.
![](House/Floor-StudySm.jpg)
Installing ash floor in the study/computer nook.
![](House/WallSm.jpg)
This composite photo shows the completed loft railing. John gets to be
two places at once and Lon sports a strange "do"!
![](House/Windows2Sm.jpg)
Composite photo showing the "Great Room" from the hall entry.
![](House/Fireplace07Sm.jpg)
Our main source of heat is a Tulikivi
soapstone fireplace.
Loft
![](House/LoftStairRail3Sm.jpg)
Stairway up to loft.
![](House/LoftRail1Sm.jpg)
Railing around the loft. You can also see that most of the "ribs"
in the ceiling have been installed.
![](House/Carpet-Loft1Sm.jpg)
Loft is complete--carpet installed.
Kitchen
![](House/Kitchen3Sm.jpg)
Kitchen-to-be. Pantry is on the left. Refrigerator "nook" is
in the back.
![](House/Floor-Kitchen1Sm.jpg)
Kitchen after painting and flooring, but obviously, before cabinets and
appliances.
![](House/KitchenCabs11.jpg)
The kitchen takes shape as cabinetry is installed.
![](House/Kitchen3aSm.jpg)
Cabinets, ceiling, and window trim completed. Lighting still has a ways
to go!
![](House/SoapstoneSlabs2Sm.jpg)
One of six slabs of soapstone that will be used for our kitchen counters.
![](House/Countertop2Sm.jpg)
Above: Countertop after waxing. Below: Countertop before waxing.
Same countertop after waxing
![](House/Countertop10Sm.jpg)
The countertop on the other side of the kitchen required pieceing slabs
together.
![](House/Kitchen13Sm.jpg)
The kitchen just needs a backsplash and appliances.
![](House/Backsplash-CounterSm.jpg)
The backsplash is ceramic tile, with left-over soapstone tiles in back
of the kitchen sink.
Almost complete --appliances have been added.
![](House/Backsplash-SinkSm.jpg)
Soapstone backsplash has been installed behind sink. The drinking water
purifier takes most of the iron out of the water--but it tastes fine without
it. We still need to disinfect all the water lines in the house before
we can pass the health department's water test and get a "certificate
of occupancy".
Baths
Left: Master bath has western cedar walls and a heated floor.
Right: Walls have been sealed with polyurethane and vanity and sink have
been installed. It's almost impossible to get a picture of any sort in
this room!
![](House/Half-Bath3Sm.jpg)
Half-bath / Powder room / Guest bath -- take your pick!
Master Bedroom
It's difficult to get a decent picture in the master bedroom.
![](House/Cedar-WallSm.jpg)
Left: Ash hardwood floor being installed in the master bedroom. The walk-in
closet is on the left and the master bath is on the right.
Right: Eastern redcedar wall in closet. It really is that purple--and
the flooring in the corner is hard rock maple we used when we ran a half-box
short on the ash floor (oops!).
![](House/MBedroom2Sm.jpg)
The main-floor master bedroom is just about done.
Continue to Part 4 - Downstairs | Return
to Index Page
Susan Wells Rollinson
Remodeled October 2019. Updated 1/28/07.
|